*2014 – 2020 Rural Development Programme
Website developed with EAFRD co-financing Responsible for information: Name of the beneficiary of the Operation Managing Authority of the Programme: Lombardy Region
Contributions
| PSR measures of the Lombardy Region and the Piedmont Region which the Company has joined (PSR 2000 – 2006/ 2007 – 2013 and 2014 – 2020) | PSR programming period | Amount of the contribution/prize (euro) |
| Operation 10.1.1 – Biodiversity of rice fields (ditches) 2012 campaign | PSR 2014 – 2020 | 41.260,00 |
| Operation 8.1.1 – 2022 campaign Lombardy Region – contribution to the plant | PSR 2014 – 2020 | 4.254,88 |
| Operation 8.1.1 – 2020 Campaign Piedmont Region – contribution to the Plant | PSR 2014 – 2020 | 17.791,04 |
| Operation 12.2.1 PSR Piedmont Region – “Compensation for lost income and additional costs from environmental constraints in the forest areas of Natura 2000 sites” | PSR 2014 – 2020 | 7.928,50 |
| Operation 10.1.1 – Biodiversity of rice fields (ditches) 2016 campaign | PSR 2014 – 2020 | 61.200,00 |
| Measure 8.1.1 Piedmont 2018 campaign – POPLAR Planting contribution | PSR 2014 – 2020 | 41.081,41 |
| Measure 8.1.1 Piedmont 2018 campaign – Medium-long cycle broad-leaved plantations – Plant contribution | PSR 2014 – 2020 | 26.187,69 |
| Operation 8.1.1 2016 campaign Piedmont Region – contribution to the plant | PSR 2014 – 2020 | 23.419,75 |
| Operation 8.1.1 2017 campaign Lombardy Region – contribution to the plant | PSR 2014 – 2020 | 11.184,79 |
| Operation 8.1.1 2016 campaign first Lombardy Region tender – contribution to the plant | PSR 2014 – 2020 | 40.090,31 |